Set the timer to 149 seconds

00:00:00

How to use the online timer

While the gas boiler circuit is repressurising, you are simply waiting beside it, watching the gauge rather than starting another job. Two minutes and twenty-nine seconds gives you a defined pause while water enters the system. Keep your attention on the boiler so you can close the filling loop promptly if the gauge reaches the level stated in its instructions before the alert sounds.

Repressurising can outlast a phone’s usual screen timeout, so the display may go dark while you are still beside the boiler. The countdown should continue even when the screen is off, although battery-saving settings can affect what happens in the background. If the phone locks, leave it within hearing distance and avoid repeatedly waking it, as the gauge remains the more relevant guide while the circuit fills.

When the alert interrupts the wait, return straight to the filling loop and gauge rather than relying on the elapsed interval alone. Close the valves as directed for your boiler, then check whether the reading has settled at the level shown in the manufacturer’s instructions. UK boiler arrangements vary, and a reading that changes after filling may need time to stabilise before you decide whether any further adjustment is needed.

Common questions

Why might repressurising a gas boiler circuit take less or more than this interval?

The starting pressure, the filling-loop arrangement and how far the valves are opened can all affect the filling time. Stop when the gauge reaches the level given in the boiler instructions, even if the alert has not sounded.

What if the gas boiler circuit has not reached the instructed pressure when this interval ends?

Check the gauge and continue only while following the boiler’s filling instructions. If the pressure does not rise as expected or you are unsure about the controls, close the valves and consult a qualified heating engineer.